★★★★★
“" Eagle did our primary bath top to bottom. Daily updates, foreman on site every morning, and the finished space looks better than the renderings. Fixed price held — no surprise upcharges. Would absolutely hire again. "”
Prince George's County · MD · MHIC #117311
Walk-in showers, double vanities and waterproofing done right — baths designed around real morning routines.

The typical Berwyn Heights bath project trades a tub-shower combo and a single vanity for a walk-in shower, double sinks and storage that was designed, not squeezed in.
Berwyn Heights is a small historic town of cottages, Cape Cods and colonials near Lake Artemesia, where remodels are surgical — kitchens that open without erasing character, careful additions, and baths modernized inside their original footprints.
What we quote in Berwyn Heights depends on where in Berwyn Heights you stand. The homes around the Lake Artemesia area ask different things of a remodel than the ones near the historic Berwyn Heights town streets around Pontiac Street — different ages, different bones, different budgets. That is why the estimate starts at your kitchen table, with your rooms measured and your ZIP (20740) permit path already mapped.
Quick Answer: A full bathroom remodel in Maryland typically costs $15,000–$35,000 and completes in 4–6 weeks once permits are issued. Eagle Home Improvements is an MHIC-licensed design-build remodeler (MHIC #117311) handling demolition, plumbing, electrical, tile, and finish in-house. Free estimate: (240) 266-8317.
Pricing
| Scope | Investment range | Includes |
|---|---|---|
| Designer refresh | $8,500 – $18,000 | Premium vanity, designer fixtures, custom paint, statement lighting, mirror, hardware. Same footprint. |
| Half / powder bath | $15,000 – $22,000 | Full surface replacement, premium toilet and vanity, custom tile and lighting. |
| Standard full bath | $22,000 – $38,000 | New walk-in shower or freestanding tub, designer tile, vanity, fixtures, lighting, ventilation. |
| Primary suite remodel | $38,000 – $65,000 | Walk-in shower with bench, double vanity, freestanding tub, heated floor, custom storage. |
| Luxury / full gut | $65,000 – $125,000+ | Custom millwork, stone slabs, steam shower, smart fixtures, full layout reconfiguration. |
Ranges reflect Maryland market conditions for 2026. Final price depends on county labor rates, fixture grade, and structural complexity. Free fixed-price quote after one in-home visit.
Process
Materials we use
Permits & code
Bathroom remodels involving plumbing relocation, electrical updates, or structural changes require a permit in every Maryland jurisdiction we serve. We file permits in Montgomery, Howard, Anne Arundel, Baltimore County, Baltimore City, Prince George's, Frederick, Carroll, and Charles counties on your behalf — and coordinate every inspection.
Verify our credentials: MD MHIC License Lookup · MD Home Improvement Commission
Warranty
5-year workmanship warranty plus manufacturer warranties on every fixture, tile, and finish. Documented in writing at project close.
Sub-services for bathroom remodeling
Eagle Home Improvements handles every variation of bathroom remodeling — from quick refreshes to full custom builds. MD-specific notes flag county code, climate, or market considerations for each.
Maintenance — keep it perfect
MD climate (humid summers, freeze-thaw winters, high pollen) is harder on finishes than coastal CA or arid SW. These tips extend the life of your investment by years.
FAQ
In Berwyn Heights, bathroom remodeling projects typically run $22,000 – $48,000 — starting at $22,000. Those are the same ranges published in our Maryland pricing guide and on our starting prices page. Your exact number is a fixed-price written quote after a free in-home estimate — the price we sign is the price you pay.
Yes — any plumbing relocation, electrical update, or structural change requires a permit in every MD county we serve. Eagle Home Improvements pulls every permit on your behalf.
Yes. Demolition, disposal, and clean-up are included in every fixed-price quote. You will not need a separate dumpster or disposal service.
Yes — the visit, the measurements and the fixed-price written quote are free, with no obligation to build with us. We would rather earn the project with a clear number than sell it with a vague one.
Typical Maryland ranges apply in Berwyn Heights: bathroom remodels run about $22,000–$48,000 and kitchens $38,000–$115,000, with additions and whole-home projects quoted by scope. Your exact number comes from a free in-home estimate — we measure, talk through materials, and leave a fixed-price written quote within 48 hours. Around the historic Berwyn Heights town streets around Pontiac Street, the first project we quote most often is kitchen remodeling — bring us the room and we will price it exactly.
Homeowner Reviews
★★★★★
“" Eagle did our primary bath top to bottom. Daily updates, foreman on site every morning, and the finished space looks better than the renderings. Fixed price held — no surprise upcharges. Would absolutely hire again. "”
★★★★★
“" Whole-home renovation in our Eastport house. The historic district approval alone made me consider walking away from the project, but they handled HPC, the County, and HOA without me having to lift a finger. "”
★★★★★
“" Kitchen + bath combo. The crew was respectful of the rest of the house — ZipWall everywhere, RamBoard on the floors, no dust in the rest of the home. We have two kids and stayed in the house the whole time. "”
Free In-Home Consultation
One in-home visit. One fixed-price quote within 48 hours. No hard sell, no surprise upcharges — just a clear plan from an MHIC-licensed design-build team.
Prefer to talk now? (240) 266-8317