★★★★★
“" Eagle did our primary bath top to bottom. Daily updates, foreman on site every morning, and the finished space looks better than the renderings. Fixed price held — no surprise upcharges. Would absolutely hire again. "”
Prince George's County · MD · MHIC #117311
Kitchens, baths, systems and finishes in one phased plan — the whole house, one accountable contract.

Whole-home renovation shows up in Bladensburg when a great street hides a tired interior — we phase kitchen, baths and living spaces under one design so the house reads as one project.
One of Maryland's oldest port towns, Bladensburg has sturdy early-20th-century homes and post-war housing near the Anacostia River that benefit from whole-home renovation, drywall and paint work.
Our Bladensburg calendar fills from a few familiar directions: families near the neighborhoods along MD-450 (Annapolis Road) planning whole-home renovation, owners around the Anacostia River waterfront calling about drywall repair & installation, and a steady line of painting services in between. Different streets, same standard — one crew, one fixed price, one warranty.
Quick Answer: Whole-home renovations in Maryland typically run $120,000–$400,000+ over 4–8 months. Eagle Home Improvements manages every trade — kitchen, baths, floors, walls, mechanicals, exterior — under one MHIC license (MHIC #117311) and one fixed-price contract.
Pricing
| Scope | Investment range | Includes |
|---|---|---|
| Mid-tier whole home (2,000 sq ft) | $120,000 – $200,000 | Kitchen, 2 baths, refresh of all surfaces, paint, flooring throughout. |
| Premium whole home (2,500 sq ft) | $200,000 – $350,000 | Custom kitchen, primary suite, finished basement, exterior refresh. |
| Luxury full gut (3,000+ sq ft) | $350,000 – $700,000+ | Down to studs, structural changes, full mechanical replacement, top-tier finishes. |
Ranges reflect Maryland market conditions for 2026. Final price depends on county labor rates, fixture grade, and structural complexity. Free fixed-price quote after one in-home visit.
Process
Materials we use
Permits & code
Whole-home work usually requires multiple permits: building, electrical (often service upgrade), plumbing, mechanical, and sometimes structural. We file all of them and manage the inspection sequence.
Verify our credentials: MD MHIC License Lookup · MD Home Improvement Commission
Warranty
5-year workmanship warranty across the entire project plus manufacturer warranties on every system.
Sub-services for whole-home renovation
Eagle Home Improvements handles every variation of whole-home renovation — from quick refreshes to full custom builds. MD-specific notes flag county code, climate, or market considerations for each.
Maintenance — keep it perfect
MD climate (humid summers, freeze-thaw winters, high pollen) is harder on finishes than coastal CA or arid SW. These tips extend the life of your investment by years.
FAQ
In Bladensburg, whole-home renovation projects typically run $185,000 – $550,000+ — starting at $185,000. Those are the same ranges published in our Maryland pricing guide and on our starting prices page. Your exact number is a fixed-price written quote after a free in-home estimate — the price we sign is the price you pay.
For full guts, yes — the project completes 30–40% faster and costs slightly less without livability constraints. For phased work we keep one floor functional throughout.
Yes. Wall removal, beam installation, foundation reinforcement, second-story additions — all coordinated with our structural engineer partners.
Typical Maryland ranges apply in Bladensburg: bathroom remodels run about $22,000–$48,000 and kitchens $38,000–$115,000, with additions and whole-home projects quoted by scope. Your exact number comes from a free in-home estimate — we measure, talk through materials, and leave a fixed-price written quote within 48 hours. Around the historic port town center, the first project we quote most often is whole-home renovation — bring us the room and we will price it exactly.
Typical construction timelines with our in-house crew: bathrooms 4–7 weeks, kitchens 7–11 weeks, basements 7–11 weeks, additions 14–22 weeks. Design and permitting happen before demo, and your schedule is written into the contract before work begins.
Homeowner Reviews
★★★★★
“" Eagle did our primary bath top to bottom. Daily updates, foreman on site every morning, and the finished space looks better than the renderings. Fixed price held — no surprise upcharges. Would absolutely hire again. "”
★★★★★
“" Whole-home renovation in our Eastport house. The historic district approval alone made me consider walking away from the project, but they handled HPC, the County, and HOA without me having to lift a finger. "”
★★★★★
“" Kitchen + bath combo. The crew was respectful of the rest of the house — ZipWall everywhere, RamBoard on the floors, no dust in the rest of the home. We have two kids and stayed in the house the whole time. "”
Free In-Home Consultation
One in-home visit. One fixed-price quote within 48 hours. No hard sell, no surprise upcharges — just a clear plan from an MHIC-licensed design-build team.
Prefer to talk now? (240) 266-8317