★★★★★
“" Eagle did our primary bath top to bottom. Daily updates, foreman on site every morning, and the finished space looks better than the renderings. Fixed price held — no surprise upcharges. Would absolutely hire again. "”
Prince George's County · MD · MHIC #117311
Walk-in showers, double vanities and waterproofing done right — baths designed around real morning routines.

Bathrooms follow close behind in East Riverdale — dated hall baths, primary suites with garden tubs nobody uses, and showers ready for modern waterproofing and real water pressure.
East Riverdale's post-war brick homes, ranchers and small colonials sit in a diverse, transit-accessible community inside the Beltway corridor. Kitchen and bath updates, basement finishing and flooring replacements are steadily modernizing homes that were built modest and solid.
From the homes bordering Riverdale Park to the Baltimore-Washington Parkway, East Riverdale projects share one trait: the owners did the math on moving and chose to stay. So the work concentrates where staying pays — kitchen remodeling, bathroom remodeling and basement finishing — done once, done under permit, and done by a crew that will still be here for the next phase.
Quick Answer: A full bathroom remodel in Maryland typically costs $15,000–$35,000 and completes in 4–6 weeks once permits are issued. Eagle Home Improvements is an MHIC-licensed design-build remodeler (MHIC #117311) handling demolition, plumbing, electrical, tile, and finish in-house. Free estimate: (240) 266-8317.
Pricing
| Scope | Investment range | Includes |
|---|---|---|
| Designer refresh | $8,500 – $18,000 | Premium vanity, designer fixtures, custom paint, statement lighting, mirror, hardware. Same footprint. |
| Half / powder bath | $15,000 – $22,000 | Full surface replacement, premium toilet and vanity, custom tile and lighting. |
| Standard full bath | $22,000 – $38,000 | New walk-in shower or freestanding tub, designer tile, vanity, fixtures, lighting, ventilation. |
| Primary suite remodel | $38,000 – $65,000 | Walk-in shower with bench, double vanity, freestanding tub, heated floor, custom storage. |
| Luxury / full gut | $65,000 – $125,000+ | Custom millwork, stone slabs, steam shower, smart fixtures, full layout reconfiguration. |
Ranges reflect Maryland market conditions for 2026. Final price depends on county labor rates, fixture grade, and structural complexity. Free fixed-price quote after one in-home visit.
Process
Materials we use
Permits & code
Bathroom remodels involving plumbing relocation, electrical updates, or structural changes require a permit in every Maryland jurisdiction we serve. We file permits in Montgomery, Howard, Anne Arundel, Baltimore County, Baltimore City, Prince George's, Frederick, Carroll, and Charles counties on your behalf — and coordinate every inspection.
Verify our credentials: MD MHIC License Lookup · MD Home Improvement Commission
Warranty
5-year workmanship warranty plus manufacturer warranties on every fixture, tile, and finish. Documented in writing at project close.
Sub-services for bathroom remodeling
Eagle Home Improvements handles every variation of bathroom remodeling — from quick refreshes to full custom builds. MD-specific notes flag county code, climate, or market considerations for each.
Maintenance — keep it perfect
MD climate (humid summers, freeze-thaw winters, high pollen) is harder on finishes than coastal CA or arid SW. These tips extend the life of your investment by years.
FAQ
In East Riverdale, bathroom remodeling projects typically run $22,000 – $48,000 — starting at $22,000. Those are the same ranges published in our Maryland pricing guide and on our starting prices page. Your exact number is a fixed-price written quote after a free in-home estimate — the price we sign is the price you pay.
Yes. We regularly work in 1920s–1960s Maryland homes and source period-appropriate tile, fixtures, and millwork while modernizing electrical and waterproofing to current code.
5-year workmanship warranty plus full manufacturer warranties on fixtures, tile, and surfaces. Signed at project completion.
Typical construction timelines with our in-house crew: bathrooms 4–7 weeks, kitchens 7–11 weeks, basements 7–11 weeks, additions 14–22 weeks. Design and permitting happen before demo, and your schedule is written into the contract before work begins.
Yes — the visit, the measurements and the fixed-price written quote are free, with no obligation to build with us. We would rather earn the project with a clear number than sell it with a vague one.
Homeowner Reviews
★★★★★
“" Eagle did our primary bath top to bottom. Daily updates, foreman on site every morning, and the finished space looks better than the renderings. Fixed price held — no surprise upcharges. Would absolutely hire again. "”
★★★★★
“" Whole-home renovation in our Eastport house. The historic district approval alone made me consider walking away from the project, but they handled HPC, the County, and HOA without me having to lift a finger. "”
★★★★★
“" Kitchen + bath combo. The crew was respectful of the rest of the house — ZipWall everywhere, RamBoard on the floors, no dust in the rest of the home. We have two kids and stayed in the house the whole time. "”
Free In-Home Consultation
One in-home visit. One fixed-price quote within 48 hours. No hard sell, no surprise upcharges — just a clear plan from an MHIC-licensed design-build team.
Prefer to talk now? (240) 266-8317