★★★★★
“" Eagle did our primary bath top to bottom. Daily updates, foreman on site every morning, and the finished space looks better than the renderings. Fixed price held — no surprise upcharges. Would absolutely hire again. "”
Montgomery County · MD · MHIC #117311
From hall baths to primary suites: showers, soaking tubs, vanities and tile, built over waterproofing we warranty.

Bathrooms follow close behind in Cabin John — dated hall baths, primary suites with garden tubs nobody uses, and showers ready for modern waterproofing and real water pressure.
Cabin John's wooded village streets along MacArthur Boulevard hold an eclectic mix of cottages, mid-century homes and custom houses where remodels lean toward character-preserving kitchens, baths and additions.
Geography shapes the work here. Around the village along MacArthur Boulevard, the questions are about fitting new space and new systems into homes that were built for a different era, while near Clara Barton Parkway corridor the projects skew toward kitchen remodeling and home additions. We plan for both — and for the permit office that reviews them.
Quick Answer: A full bathroom remodel in Maryland typically costs $15,000–$35,000 and completes in 4–6 weeks once permits are issued. Eagle Home Improvements is an MHIC-licensed design-build remodeler (MHIC #117311) handling demolition, plumbing, electrical, tile, and finish in-house. Free estimate: (240) 266-8317.
Pricing
| Scope | Investment range | Includes |
|---|---|---|
| Designer refresh | $8,500 – $18,000 | Premium vanity, designer fixtures, custom paint, statement lighting, mirror, hardware. Same footprint. |
| Half / powder bath | $15,000 – $22,000 | Full surface replacement, premium toilet and vanity, custom tile and lighting. |
| Standard full bath | $22,000 – $38,000 | New walk-in shower or freestanding tub, designer tile, vanity, fixtures, lighting, ventilation. |
| Primary suite remodel | $38,000 – $65,000 | Walk-in shower with bench, double vanity, freestanding tub, heated floor, custom storage. |
| Luxury / full gut | $65,000 – $125,000+ | Custom millwork, stone slabs, steam shower, smart fixtures, full layout reconfiguration. |
Ranges reflect Maryland market conditions for 2026. Final price depends on county labor rates, fixture grade, and structural complexity. Free fixed-price quote after one in-home visit.
Process
Materials we use
Permits & code
Bathroom remodels involving plumbing relocation, electrical updates, or structural changes require a permit in every Maryland jurisdiction we serve. We file permits in Montgomery, Howard, Anne Arundel, Baltimore County, Baltimore City, Prince George's, Frederick, Carroll, and Charles counties on your behalf — and coordinate every inspection.
Verify our credentials: MD MHIC License Lookup · MD Home Improvement Commission
Warranty
5-year workmanship warranty plus manufacturer warranties on every fixture, tile, and finish. Documented in writing at project close.
Sub-services for bathroom remodeling
Eagle Home Improvements handles every variation of bathroom remodeling — from quick refreshes to full custom builds. MD-specific notes flag county code, climate, or market considerations for each.
Maintenance — keep it perfect
MD climate (humid summers, freeze-thaw winters, high pollen) is harder on finishes than coastal CA or arid SW. These tips extend the life of your investment by years.
FAQ
In Cabin John, bathroom remodeling projects typically run $22,000 – $48,000 — starting at $22,000. Those are the same ranges published in our Maryland pricing guide and on our starting prices page. Your exact number is a fixed-price written quote after a free in-home estimate — the price we sign is the price you pay.
Most full Maryland bathroom remodels cost $15,000–$35,000 in 2026. Cosmetic refreshes start around $5,000; primary-suite or luxury work runs $35,000–$80,000+. Final price depends on scope, fixture grade, and county labor rates.
Yes. We regularly work in 1920s–1960s Maryland homes and source period-appropriate tile, fixtures, and millwork while modernizing electrical and waterproofing to current code.
Typical construction timelines with our in-house crew: bathrooms 4–7 weeks, kitchens 7–11 weeks, basements 7–11 weeks, additions 14–22 weeks. Design and permitting happen before demo, and your schedule is written into the contract before work begins.
Everything we install: framing, tile, cabinetry, drywall, paint and finish work. If our workmanship fails within five years, we come back and make it right — in writing, in the same contract that covers the rest of your Cabin John project.
Homeowner Reviews
★★★★★
“" Eagle did our primary bath top to bottom. Daily updates, foreman on site every morning, and the finished space looks better than the renderings. Fixed price held — no surprise upcharges. Would absolutely hire again. "”
★★★★★
“" Whole-home renovation in our Eastport house. The historic district approval alone made me consider walking away from the project, but they handled HPC, the County, and HOA without me having to lift a finger. "”
★★★★★
“" Kitchen + bath combo. The crew was respectful of the rest of the house — ZipWall everywhere, RamBoard on the floors, no dust in the rest of the home. We have two kids and stayed in the house the whole time. "”
Free In-Home Consultation
One in-home visit. One fixed-price quote within 48 hours. No hard sell, no surprise upcharges — just a clear plan from an MHIC-licensed design-build team.
Prefer to talk now? (240) 266-8317